Skip to content
Alpha Water & Power

Serving Van Horn, Texas

Water, wastewater & power solutions in Van Horn, TX

Alpha Water & Power designs, builds, delivers and supports treatment plants and power systems for projects in Van Horn. One team, from engineering through ongoing support.

Water & power in Van Horn

What shapes infrastructure projects in Van Horn

Van Horn is the Culberson County seat, about 120 miles east of El Paso where Interstate 10 meets U.S. 90 and Texas 54. Its water comes from the West Texas bolson aquifers and is overseen locally by a groundwater conservation district, so supply is a long-term planning question for any large new user. As data center, energy and large-load development extends across West Texas, sites near Van Horn need compact treatment and power that can run without a long utility connection.

Texas combines drought, rapid population growth, a large energy sector and a state water plan that calls for new supply in nearly every region. Alpha Water & Power is headquartered in Garland, Texas, so Texas projects are engineered, built and supported close to home. Alpha Water & Power brings design, equipment, installation and support under one contract, so owners in Van Horn can move from concept to a running system without managing a chain of vendors.

Who we work with in Van Horn

  • Data center and large-load power
  • Oil and gas
  • Wind and solar energy
  • Aerospace and launch support
  • Municipal utilities
Coverage
Van Horn and Culberson County
Headquarters
Garland, Texas
Regulator
TCEQ

What we deliver

Solutions for Van Horn projects

Ranked for the conditions in this area. Every solution is available as a turnkey scope or as equipment only.

Also available: Advanced water filtration, Data center and industrial power, Permitting and compliance support, ScaleShield water chemistry, LG Chem RO membranes, Support for consulting engineers and public works, DAF, FOG and wastewater recycling.

Design. Build. Deliver. Support.

One team from first sketch to startup in Van Horn

  1. 01

    Design

    We size the system from your flow, source water and discharge or product-water targets, then price it so you can budget.

  2. 02

    Build

    Equipment is fabricated, assembled and tested before it ships, so there are fewer surprises on site.

  3. 03

    Deliver

    We handle freight, installation and commissioning, and train your operators.

  4. 04

    Support

    Spares, chemistry, membranes and service stay available after startup, from the same team.

Texas compliance

Permitting and regulation in Texas

Treatment and discharge projects in Van Horn fall under the Texas Commission on Environmental Quality (TCEQ). Typical approvals include TPDES discharge permits and TCEQ plant design and reuse authorizations. Water rights and supply planning are overseen by the Texas Water Development Board (TWDB).

Our team helps you prepare the process data, design basis and documentation that engineers and regulators need. Read about permitting support.

Funding for Texas projects

Water and wastewater projects in Texas can often be financed through Texas Water Development Board programs, the Texas Water Fund and federal State Revolving Fund loans. Eligibility depends on the owner and project, so confirm with the program before you commit.

Size a system free in AWP Labs

Questions

Water and power projects in Van Horn: answers

Does Alpha Water & Power serve Van Horn, TX?

Yes. Alpha Water & Power is headquartered in Garland, Texas and designs, builds, delivers and supports water, wastewater and power infrastructure for projects in Van Horn and across Texas. Call 800-283-5007 or send the project details through our contact form.

What water and wastewater solutions does AWP offer in Van Horn?

For Van Horn, the most relevant solutions are mbbr wastewater treatment, turnkey water and wastewater plants, islandable microgrids and reverse osmosis desalination. Everything is delivered as a turnkey scope or as equipment alone, depending on what your project needs.

What permits does a treatment project in Van Horn need?

Texas projects are regulated by the Texas Commission on Environmental Quality (TCEQ). Typical approvals include TPDES discharge permits and TCEQ plant design and reuse authorizations, and local utilities or counties may add their own requirements such as sewer-use limits. Our team helps prepare the technical information your engineer or the permitting authority needs.

Can AWP support data center and high-tech manufacturing projects in Van Horn?

Yes. We help with makeup and process water treatment, cooling blowdown and wastewater pretreatment, and with on-site power such as battery storage and islandable microgrids when utility capacity is constrained. These are planned together so neither water nor power holds up the schedule.

How do I get a quote for a project in Van Horn?

Send the flow, source water, discharge or product-water targets, site location and timeline using the form on this page, or call 800-283-5007. An AWP engineer will come back with a design, a price and a schedule. Texas projects may also qualify for funding through Texas Water Development Board programs, the Texas Water Fund and federal State Revolving Fund loans.

Get a quote for your Van Horn, TX project

The more you can share about flow, water quality and site, the faster we can come back with something useful.

What can we help with?

Opens your email app with the message ready to send.

Talk to an engineer800-283-5007Email usinfo@awp.co

Headquartered in Garland, Texas. Send the flow, source water, discharge limits and timeline for your Van Horn project and an AWP engineer will reply with a design, a price and a schedule.

Call nowGet a quote